NavigationContentFooter
Suggest an edit

Understanding InterLink statuses

Reviewed on 24 October 2024Published on 24 October 2024
Important

InterLink is currently in Private Beta, and only available to selected testers.

An InterLink always has a status, which can be retrieved via the API using the Get a link call.

This document explains the different statuses possible for an InterLink, and how to understand them.

StatusDescription
ConfiguringInterLink is configuring and is in a transient state. No user actions can be carried out.

This status could occur immediately after creating your InterLink order, while Scaleway processes the order and configures the InterLink, or at any time when a new configuration is being applied.
RequestingInterLink has been created successfully on the Scaleway side, provisioning must now be requested from the chosen partner.

You must contact your partner to request that they provision your InterLink. Either a contact email address, or a link to the partner’s portal is provided via the Scaleway API. Scaleway does not make the request to the partner, this is the responsibility of the user.

The InterLink will remain in Requesting status until the partner accepts the request, at which point it moves into Provisioning status. Alternatively, the partner may refuse the request, or the request may time out.
FailedScaleway was unable to create the InterLink.

This usually occurs when there is a configuration error on the Scaleway side while attempting to create the InterLink. Our technical team is automatically made aware of such a problem, and will intervene to resolve it. When the problem is resolved, the InterLink should move to Requesting status. Wait for technical intervention, or open a support ticket if you require further help.
ProvisioningThe partner has accepted the InterLink request, and is now provisioning the connection at their end.

The InterLink is not yet operational: traffic cannot yet flow. You must wait for the partner to finish provisioning the connection. When provisioning is complete, the InterLink should move to Active status.
ExpiredNo response was received from the selected partner in the 10 days following the creation of the InterLink on the Scaleway side.

If Scaleway does not receive a response from the selected partner after 10 days, the InterLink moves to Expired status. It is not possible to take action to move this InterLink to a different status: you must delete the InterLink, and create a new order if you wish to try again.
RefusedThe partner refused the request to provision the InterLink.

It is not possible to take action to move this InterLink to a different status: you must delete the InterLink, and create a new order if you wish to try again with a different partner or configuration.
ActiveThe InterLink is in a ready state, and traffic can flow.

The InterLink has been provisioned on both the Scaleway side and the partner side, and is now in an active state. Traffic can flow across the InterLink (presuming that allowed routes lists, route propagation, and an attached VPC are correctly configured).
Limited ConnectivityThe InterLink is provisioned, but IP connectivity is limited.

This may be the case if either, but not both of, the BGP, IPv4, or IPv6 sessions are down.
Down / All downThe InterLink is provisioned, but there is no IP connectivity.

The InterLink has been provisioned successfully on both sides, but both BGP sessions (IPv4 and IPv6) are down and traffic cannot flow. Open a support ticket with Scaleway, or contact your partner.
LockedThe InterLink has been locked by the Trust and Safety team

You cannot carry out any actions on the InterLink. Open a support ticket.
DeprovisioningDeletion of the InterLink has been initiated on either the partner side or the Scaleway side, but has not been finalized.

An InterLink must be deleted by both Scaleway and the partner in order to move to Deleted status. If you have deleted an InterLink on the Scaleway side, ensure you contact the partner separately to request that they delete the resource on their side. If you have deleted an InterLink on the partner side, ensure that you delete the resource on the Scaleway side.
DeletedThe InterLink has been deprovisioned by both Scaleway and the partner, and is now deleted.
Was this page helpful?
API DocsScaleway consoleDedibox consoleScaleway LearningScaleway.comPricingBlogCareers
© 2023-2024 – Scaleway